L-ASC10 and Platform Manager 2 Hardware Checklist Technical Note

2022-02-14
●Introduction
■When designing complex hardware using L-ASC10 and Platform Manager 2, designers must pay special attention to critical hardware configuration requirements. This technical note guides the designer through these critical hardware requirements related to the L-ASC10 and Platform Manager 2 devices. This document does not provide detailed step-by-step instructions but gives a high-level summary and checklist to assist in the design process.
■The critical hardware areas covered in this technical note include:
▲Power supplies as they relate to the Platform Manager 2 supply rails and how to connect them to the PCB and the associated system
▲Configuration and how to connect the configuration mode selection for proper power up configuration
▲System connections required for proper operation of the Platform Manager 2 system
▲Device I/O interface and critical signals.

Lattice

L-ASC10MachXO2MachXO3LPTM21LPTM21L

More

Part#

FPGA

More

More

Application note & Design Guide

More

More

Please see the document for details

More

More

ftBGA;caBGA

English Chinese Chinese and English Japanese

January 2020

Revision 1.2

FPGA-TN-02175-1.2

1.1 MB

- The full preview is over. If you want to read the whole 23 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: