L-ASC10 and Platform Manager 2 Hardware Checklist Technical Note
■When designing complex hardware using L-ASC10 and Platform Manager 2, designers must pay special attention to critical hardware configuration requirements. This technical note guides the designer through these critical hardware requirements related to the L-ASC10 and Platform Manager 2 devices. This document does not provide detailed step-by-step instructions but gives a high-level summary and checklist to assist in the design process.
■The critical hardware areas covered in this technical note include:
▲Power supplies as they relate to the Platform Manager 2 supply rails and how to connect them to the PCB and the associated system
▲Configuration and how to connect the configuration mode selection for proper power up configuration
▲System connections required for proper operation of the Platform Manager 2 system
▲Device I/O interface and critical signals.
|
|
Application note & Design Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
ftBGA;caBGA |
|
English Chinese Chinese and English Japanese |
|
January 2020 |
|
Revision 1.2 |
|
FPGA-TN-02175-1.2 |
|
1.1 MB |
- +1 Like
- Add to Favorites
Recommend
- Why GaN in Space?
- Innoscience Built The First World-class 8-inch Wafer FAB with Gold-free and CMOS Compatible Process
- Two kinds of structure of unit in SiC power MOSFET: plane structure and groove structure
- Successful Demonstration of Next-Gen Ka-band Rx Beamforming IC Portfolio with 1.5dB NF LNA
- Futureway Has Developed a Variety of Silicone Solutions for Battery Pack
- UnitedSiC Rediscovers The Perfect Switch with SiC FETs
- These Kinds of MOS Tubes “Breakdown“, How Many Do You Know?
- Low-Frequency Noise Modeling When Quantum Chips Are Getting Noiser
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.