Order NO./Brand Description Supplier/Quality Assurance Availability

高性能防复制加密芯片

RJGT101

集成了 256 Byte 的 EEPROM(包含 16 Byte 的密钥和 8Byte 的 UID), 执行 RC4 算法的加密芯片。它与 MCU 可通过 RSD 单线串行接口通信,芯片支持计次功能。

DFN6

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock5,000,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

Surface Mount Multilayer Varistor

SV0603E5R5G0B

Maximum DC operating voltage:5.5V,Vv(Min):7.6V,Vv(Max):12V,Vc:25V,Imax:1A,Cp(Typ):5pF

0603

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock4,202,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

电子配线连接器

MWGA101-0401A801E2BN-02

电子配线连接器,GREENCONN,MWGA101-0401A801E2BN-02,直插针座,公插针,4P,2.5mm,1ROW,通孔安装

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock4,032,200

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

Surface Mount Multilayer Varistor

SV0402E9R0G0B

Maximum DC operating voltage:9V,Vv(Min):11V,Vv(Max):17V,Vc:35V,Imax:1A,Cp(Typ):5pF

0402

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock3,379,896

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

静电保护二极管

SE05D3S41GZ

Working Peak Reverse Voltage:5.0V,Junction Capacitance:12pF,Maximum Reverse Peak Pulse Current:1A,Clamping Voltage:9.8V

SOD-323

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock1,697,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

Surface Mount Multilayer Varistor

SV0603N5R5G0B

Maximum DC operating voltage:5.5V,Maximum AC operating voltage:4V,Vv(Min):8V,Vv(Max):18V,Vc:24V,Imax:30A,Cp(Typ):270pF

0603

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock1,604,400

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

肖特基二极管

SKD0203

肖特基二极管;最大重复峰值反向电压VRRM=30V,最大平均整流输出电流IF=200mA,正向电压VF=0.6V@IF=100mA

DFN1006-2L

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock1,510,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

静电保护二极管

SE05D5S01HW

Working Peak Reverse Voltage:5V,Junction Capacitance:7pF,Maximum Reverse Peak Pulse Current:4.5A,Clamping Voltage:15V

SOD-523

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

Price$ 0.0107

In Stock1,335,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

静电保护二极管

SE05D5L01GZ

Working Peak Reverse Voltage:5V,Vbr/Vt:6.5V,Clamping Voltage:20V,Maximum Peak Pulse Current:4A,Maximum Reverse Leakage Current:1A,Junction Capacitance(Typ):0.4pF

SOD-523

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

Price$ 0.0178

In Stock1,050,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

Surface Mount Multilayer Varistor

SV0402E5R5G1B

Maximum DC operating voltage:5.5V,Vv(Min):7.6V,Vv(Max):12V,Vc:25V,Imax:1A,Cp(Typ):5pF

0402

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

Price$ 0.0072

In Stock1,040,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

实时钟芯;时钟芯片

INS5699S

INS5699S 是一款低功耗、高精度实时时钟芯片,内置 32.768KHz 晶振、高精度温度传感器以及温度补偿电路,自动调整时钟精度

3225

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock1,007,213

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

三极管

MMDT2227

DUAL TRANSISTOR(NPN+PNP),VCBO=75V,VCEO=40V,VEBO=6V,IC=600mA,PC=200mW

SOT-363

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock1,000,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

磁珠

SCGB-S Series

Chip Ferrite Bead,Impedance:600Ω,Test Freq:100MHz,DCR(Max.):1Ω,Rated Current:300mA

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

Price$ 0.0029

In Stock993,350

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

静电保护二极管

SE05D3V01GZ

Working Peak Reverse Voltage:20V,Junction Capacitance:75PF,Maximum Reverse Peak Pulse Current:20A

SOD-323

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

Price$ 0.0190

In Stock955,842

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

时钟芯片

INS5710C

INS5710C 是一款低功耗带温度补偿功能的实时时钟芯片,内置32.768KHz 晶振。具有I2C 通信接口,支持日历(年,月,日,时,分,秒)功能。采用贴片SOP8 封装,适用于三表、便携式终端及其他小型电子仪器等。

SOP8

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock700,732

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

静电保护二极管

SE03D3V31GZ

Working Peak Reverse Voltage:3.3V,Junction Capacitance(Typ):90PF,Maximum Reverse Peak Pulse Current:13A,Clamping Voltage:12V

SOD-323

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

Price$ 0.0114

In Stock543,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

静电保护二极管

SE12D5V11GW

Working Peak Reverse Voltage:12V,Vbr/Vt:14.1V,Clamping Voltage:25V,Maximum Peak Pulse Current:5A,Maximum Reverse Leakage Current:0.1A,Junction Capacitance(Typ):55pF

SOD-523

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock375,000

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

Surface Mount Multilayer Varistor

SV0603N270G0A

Maximum DC operating voltage:27V,Vv(Min):32.4V,Vv(Max):40.5V,Vc:89V,Imax:30A,Cp(Typ):

0603

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

Price$ 0.0110

In Stock347,410

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

高性能防复制加密芯片

RJGT102

集成176字节EEPROM,支持关键数据存储保护,基于SHA-256加密认证算法,提供安全可靠的硬件方案保护、核心算法保护、防伪认证、版权保护。

SOT23-6L

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock321,570

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days

Surface Mount Multilayer Varistor

SV0402E180G2B

Maximum DC operating voltage:18V,Vv(Min):46V,Vv(Max):60V,Vc:110V,Imax:1A,Cp(Typ):1pF

0402

Sekorm Advanced Technology (Shenzhen) Co., Ltd

Original Certification

In Stock301,323

Ship-From Guangdong China

Expected Date of Delivery:
1.The estimated delivery time is the estimated time, excluding national statutory holidays, and is not the content of the order or contract. 2.It is limited by the delivery time and the logistics and transportation time of the goods. 3.In case of force majeure factors during the transportation of goods, such as earthquakes, floods, droughts, epidemics, etc., the delivery time may be extended.

EDD?

About 5-10 Days
Authorized Agent BrandWorld famous semiconductor and instrument suppliers
Ecological Partners

Contact Us

Email: