SA-ISO PIM Isolator CommScope Infrastructure Academy offers installation training.
■Snap hanger into isolator (2a). Always alternate hanger and isolator to prevent loose metal-to-metal contact. A maximum of 2 cable hangers can be stacked together as shown (left, 2b).
■To remove isolator(3a), use the STRT-1 tool or pliers and press base pads together. Then pull away from the mount.
■The STRT-1 tool is shown here (3b) with proper removal alignment on the base pads of the isolator.
|
|
User's Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
2019 |
|
Rev. A |
|
7841070 |
|
863 KB |
- +1 Like
- Add to Favorites
Recommend
- Things to Know About Base Station Antennas of Mobile Communication System
- YINT‘s Gas Discharge Tube for Base Station Communication Network Port (RJ45) Lightning Protection Solution
- UMS Is Committed to Developing Innovative Standards and Custom Solutions for Space Systems
- Dual-loop Digital Multi-phase Step-down Controller IS6201A Meets the Needs of Industry, Communication Applications, Supporting for LOAD LINE Function Setting
- Hua Xuanyang MOSFET Series Suitable for Brushless Motor Commutator, Having Low On-resistance, High Switching Speed, High Temperature Stability
- Energous’ Commitment to Safety: Setting the Standard in RF Wireless Charging
- Hosiden‘s Non-contact Communication Module Kit Supporting Ethernet Allows Automatic Switching Between 10/100/1000BASE Standards
- Yint Electronics Offers 48V Common Protection Scheme Solutions for 5G Communication Power Supply
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.