INCREASE AVAILABILITY AND IMPROVE CONTROLS SYSTEM Case study

2021-07-29
●The customer had multiple projects that required technical aptitude and a fundamental understanding of instrumentation and programming.
Unfortunately, the customer struggled with heavy turnover and significant training and associated costs to get their staff to the technical competency level required for the role of Instrumentation Technicians.
With a growing business and additional production shiBs, they also couldn’t guarantee a technician would be in the plant when needed.
●Employee turnover and rising labor costs led to a challenge ensuring that their technical staff could commission instrumentation on demand.
●Operators and technicians needed to learn how to program and calibrate instruments from multiple manufacturers, all with different operating instructions, requiring a higher level of technical expertise.
●The cost of instrumentation forced the customer to make compromises on previous capital projects.
●The cost of stocking instrumentation with various process fittings impacted the inventory budget for the organization.

IFM

More

More

Case Study

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2020

95 KB

- The full preview is over,the data is 1 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: