Guideline for Approval Procedure LQP 1-3
●Document "LQP - Supplier Quality Planning Procedures" outlines the requirements of IMS Connector Systems as regards its supplier quality planning (LQP).
●Attention! The requirement of IMS Connector Systems regarding LQP is not binding. The LQP 1-3 point are equivalent to PPAP 1-3. According to the preference and applied practice at the suppler, PPAP 1-3 is allowed to be used instead of LQP 1-3. The levels of the procedures are comparable – e.g. you may use PPAP 2 instead of LQP 2. Application of VDA 2.4 for sampling is acceptable.
●Those suppliers who do not use either PPAP or VDA 2.4 should apply below procedure for piece part sampling.
|
|
|
|
User's Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
05.09.2024 |
|
Rev. 10 |
|
RL-CS-007b |
|
1.5 MB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.