■General
●Document "LQP - Supplier Quality Planning Procedures" outlines the requirements of IMS Connector Systems as regards its supplier quality planning (LQP).
●Attention! The requirement of IMS Connector Systems regarding LQP is not binding. The LQP 1-3 point are equivalent to PPAP 1-3. According to the preference and applied practice at the suppler, PPAP 1-3 is allowed to be used instead of LQP 1-3. The levels of the procedures are comparable – e.g. you may use PPAP 2 instead of LQP 2. Application of VDA 2.4 for sampling is acceptable.
●Those suppliers who do not use either PPAP or VDA 2.4 should apply below procedure for piece part sampling.

IMS

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

05.09.2024

Rev. 10

RL-CS-007b

1.5 MB

- The full preview is over. If you want to read the whole 23 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: