●INSTALLATION INSTRUCTIONS
■Install the 3/4" male thread of the gland body into the EABX process seal hub opposite from where the high pressure is entering into the fitting. See photo to right.
■Install union onto the conduit and cap. Insure sufficient wire is pulled to make necessay connections at junction box.
■Feed conductors through cap, follower, insulator, sealant and second insulator up through body and into the process seal. The open side of the pin on follower must face the cap.
■Carefully assemble parts into the body. Verify that the conductors are not crimped between the Body, Insulators and Follower.
■Using a torque wrench, tighten the Cap and Body to 75 - 80 Ft-Lbs.

Eaton Bussmann

EABX-PSHP SeriesEABX-PSHP

More

Part#

High Pressure Sealing Gland

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

02/05

Revision 1

IF 1477A

112 KB

- The full preview is over,the data is 1 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: