PTR HARTMANN GmbH Approved Place of Manufacture (30000913)

2023-09-14
●This surveillance of the factory was performed according to the European Factory Inspection Procedure based on the following documents: ECS/CIG 021 - 024: 2014
●Factory Inspection Procedure - Harmonized Requirements
●The requirements have been fulfilled.
●Date of last inspection: 2023-07-13

PTR HARTMANN

Connecting deviceterminalPCB terminal blockConnector

More

More

Test Report

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2023-07-27

30000913

846 KB

- The full preview is over,the data is 2 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: