MPK06 LINE PROTECTIONS & EMC CONSIDERATIONS

2023-07-12
■TYPICAL APPLICATION:
●Below shows some blocks connected between power source and DC/DC module. Install the circuit of the block which is required.
●Each block has individual function and should be placed on the corresponding location.
●If CEMI is an Aluminum electrolytic capacitor and connected in parallel with CEMS, The capacitance we recommended for meeting EMS requirements could be CEMS pluses CEMI

P-DUKE

MPK06MPK06-12□□□MPK06-24□□□MPK06-48□□□MPK06-12□□□□□MPK06-24□□□□□MPK06-48□□□□□MPK06-12□□□AMPK06-24□□□AMPK06-48□□□AMPK06-12□□□BMPK06-12□□□B-TMPK06-24□□□BMPK06-24□□□B-TMPK06-48□□□BMPK06-48□□□B-TMPK06-12S05AMPK06-12S05BMPK06-12S12AMPK06-12S15AMPK06-24S05AMPK06-24S12AMPK06-24S15AMPK06-48S05AMPK06-48S12AMPK06-12D05AMPK06-12D12AMPK06-12D15AMPK06-24D05AMPK06-24D12AMPK06-24D15AMPK06-48D05AMPK06-48D12AMPK06-48D15AMPK06-12S12BMPK06-12S15BMPK06-24S05BMPK06-24S12BMPK06-24S15BMPK06-48S05BMPK06-48S12BMPK06-12D05BMPK06-12D12BMPK06-12D15BMPK06-24D05BMPK06-24D12BMPK06-24D15BMPK06-48D05BMPK06-48D12BMPK06-48D15B

More

Part#

More

More

Datasheet

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

12/20/2022

2.3 MB

- The full preview is over. If you want to read the whole 11 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: