VX Series Delta UPS – Agilon Family Installation & Operation Quick Guide

2023-02-15
●Operation
■Placement
▲Install the UPS in a protected area that is free of excessive dust and has adequate air flow. Place the UPS away from other units at least 20 cm to avoid interference. For best performance, keep the indoor temperature between 0° C and 40° C
■Connect to Utility Power
▲Connect the AC power cord to the utility power. Then, the UPS will start to charge its inside battery (batteries). For best result, charge the battery (batteries) for 6 hours prior to initial use. It is not recommended to connect the UPS’s AC power cord to any generator.
■Plug in Equipment
▲Plug your equipment to the Output Socket on the rear panel of the UPS.
▲Note: Circuit Breaker rating of the Branch Circuit supplied from the Mains Input panel sizing must be 6A/250Vac for 600VA and 10A/250Vac for 1000VA in accordance with National electrical codes and standards. as per schematic (Based on N.E.C NFPA 70 -2014 ; Reference: Article 240)

Deltaww

VX Series

More

Part#

UPS

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2022_12_07

V 0.3

501330210003 (QR)

1.5 MB

- The full preview is over. If you want to read the whole 3 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: