89138591 PROLINE G2

2022-07-26
INSTALLATION INSTRUCTIONS:
●Step 1: Install PROLINE G2 disconnect door and disconnect mullion on a modular frame following disconnect door installation instructions.
●Step 2: Install the disconnect/circuit breaker operating handle on the disconnect mullion per the manufacturer’s instructions. Remove the pivot bracket shown in Figure 1.
●Step 3: Position the pivot bracket (removed in step 2) so that the interlock lever (on the disconnect operating handle) fits between the two adjustable studs. See Figure 1. Secure pivot bracket to disconnect mullion with shoulder collar and hex nut.
●Step 4: Close and latch the disconnect mullion to the PROLINE G2 frame. Sliding latches are provided at the top and bottom of the mullion. See Figure 1.
●Step 5: Adjust door interlock as follows
●Step 6 - Drill mounting holes in subpanel for the specific disconnect switch/circuit breaker being installed per the manufacturer’s instructions.
●Step 7 - Install subpanel in PROLINE G2 frame (per subpanel instructions) at desired depth (variable in increments of 25mm/.98 inches).

nVent

89138591G2

More

Part#

Disconnect Door

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2018/4/17

Rev. B

89138593

2.7 MB

- The full preview is over. If you want to read the whole 12 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: