RAYCHEM STS MANAGING FLOW OF CRUDE OIL ALONG 700 KM PIPELINE USING RAYCHEM STS

2022-07-26
●KEY CHALLENGES
■The Mangala Development Pipeline (MDP) Project involved a ~700 km long, 24" in diameter, underground pipeline that needed to transfer crude oil at an elevated temperature from the Mangala Processing Terminal at Barmer, to the Salaya Terminal (pigging and SEHMS station).
■The trace heating challenges included:
▲Maintaining the temperature of the pipeline above 65°C to ensure efficient flow of the viscous crude oil along the entire length of pipeline.
▲Providing sub-stations at regular intervals throughout the length of the pipeline, for supplying power to the heating systems from on-site engine generators.
▲Prove STS technology concept in the field on a section of 24” pipeline to show design calculations meet empirical data from the test.

nVent

Skin-Effect Heat Management Systemeversatile heat management system

More

Underground Pipeline ]

More

Case Study

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2018/5/10

Raychem-WPCS-H80931-STSCrudeoil-EN-1805

1.1 MB

- The full preview is over,the data is 2 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: