Application Story: DFI The Ultra-Thin, Stable, Highly Reliable, and Shock-Resistant EC700-BT Helps Customers Build the Most Trusted Hang Rail Inspection

2022-06-18
▲From electric power, oil and gas, rail transit, water affairs, mining, aquaculture, ports, to metallurgy and other industries, urban underground pipe corridors, power tunnels, power distribution houses, traffic tunnels, rail transit tunnels, power plant coal trestle bridges, industrial plants, etc. are common scenarios of the pipe gallery. High pressure, electromagnetic solid, and humidity are primarily complex and in high-risk environments. Therefore, the inspection robots that run on hanging rails and move around in the pipe gallery have always been a ubiquitous demand. The ultra-thin, stable, high-reliability, and shock-resistant EC700-BT helps customers build the most trustworthy hanging rail pipe gallery robot.
●Region: China
●Industry: Inspection Solution
●Application: Hanging Rail Pipe Gallery Robot
●Solution: EC700-BT

DFI Incorporated

EC700-BT

More

Part#

embedded system

More

Hanging Rail Pipe Gallery Robot ]urban underground pipe corridors ]power tunnels ]power distribution rooms ]traffic tunnels ]rail transit tunnels ]power plant coal trestle bridges ]industrial plant areas ]

More

Solutions

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2021/11/23

1 MB

- The full preview is over. If you want to read the whole 5 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: