TRELLEBORG'S LNG PORTFOLIO PROVIDES THE IDEAL SOLUTION FOR SINGAPORE LNG TERMINAL

2022-04-06
■ As the first open access, multi-user LNG terminal in Asia, Singapore LNG terminal required the best in marine fender systems, docking and mooring equipment and gas transfer technology. Showcasing the strength of its broad Liquefied Natural Gas (LNG) portfolio, Trelleborg supplied the terminal’s primary and secondary LNG berths with a combined docking, mooring and fender system as well as its SeaTechnik™ Ship-Shore Safety Link System (SSL) to monitor the LNG transfer process.
■ Located on Jurong Island, the Singapore LNG Terminal, which officially opened in February 2014, plays a key role in supporting the country’s strategy for energy security, ensuring the nation can import natural gas in liquefied form from around the world.
■Richard Hepworth, President at Trelleborg's marine systems operation, said: “The use of LNG is now a mainstream, commercial reality, as the demand for energy continues to rise. With natural gas being a reliable, clean burning fossil fuel and one that is in plentiful supply, it has become a truly viable, global resource.

Trelleborg

multi-user LNG terminal

More

More

Case Study

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2019/3/19

158 KB

- The full preview is over,the data is 1 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: