Legacy ProSafe-PLC SIS Replaced with ProSafe-RS to Improve Sustainable Lifecycle Support at LNG Terminal Success Story

2022-01-07
●Executive Summary:
■Hazira LNG Private Limited (HLPL): a joint venture between Shell Gas B V. and Total Gaz Electricite Holdings, operates an LNG receiving terminal in Hazira, which is a major port and industrial hub in India's Gujarat state. Commissioned in 2005, the terminal has two 160,000 m3 storage tanks along with re-gasification and auxiliary facilities that are capable of handling 3 6 million tons of LNG per year. This is the first LNG terminal in India to be built by global energy companies.
■A 22 km pipeline connects the Hazira terminal to the national gas grid at Mora Station. The pipeline has sectionalizing valve (SV) and LNG custody transfer metering (CTM) stations that are located 4 km and 14 km from the terminal, respectively.
■The control systems for the Hazira terminal are installed in its main control room (MCR), which handles all re-gasification processes and utilities, and at the jetty facility, where arriving LNG carriers are unloaded.

YOKOGAWA

CENTUM CS 3000ProSafe-RSPLC2RS

More

Part#

process control system (PCS)control systemsafety instrumented systemtool

More

LNG ]energy ]

More

Case Study

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2020/04/25

ISD-SP-R189

224 KB

- The full preview is over. If you want to read the whole 3 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: