Migration of PC5674F to TSMC wafer fab and Copper Wirebond Product Change Notification (GC183122)

2022-03-26
●Product Identification: PC5674FF3MZP3
●Reason for Change: Manufacturing Location; Material
●Change Description:
■In order to rationalize its procurements, Teledyne e2v aligns with NXP announcement ref. 16151.
◆The primary NXP wafer manufacturing site transfer to TSMC14 will improve ability to meet customer demand.
◆The transfer from Gold to Copper wire is required to standardize manufacturing flows and mitigate against raw material cost increases

TELEDYNE E2V

PC5674FPC5674FF3MZP3PC5674FK4MZP3

More

Part#

More

More

PCN/EOL

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

25 September 2018

Rev L

GC183122

180 KB

  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: