GC-13 : SPLITTER-BOX DUAL-CABLE MONITORING WITH AN SE-135 Technical Note

2021-12-08

●An SE-135 Ground-Fault Ground-Check Monitor can protect the cables entering and leaving a dual-cable splitter box (junction box), when one is terminated with an SE-TA24A and the other with an SE-TA24B Termination Assembly. The SE-MUX was previously used to monitor two ground-check circuits by sampling each ground-check circuit every half second. As a result, ground-check trip times were increased by up to a half second. The improved method provides continuous monitoring of both ground-check circuits; therefore ground-check trip times are not increased, and the complexity of splitter boxes is reduced. Littelfuse recommends replacing the SE-MUX in splitter-box applications with an SE-TA24A and an SE-TA24B, as shown in Fig. 1.

Littelfuse

SE-135SE-TA24ASE-TA24B

More

Part#

Ground-Fault Ground-Check Monitor

More

More

Application note & Design Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

112018

Rev. 112018

TN-GC1

389 KB

- The full preview is over,the data is 2 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: