OV-12/24 SERIES INSTALLATION INSTRUCTIONS
●ADJUSTMENT PROCEDURE:
■REFER TO CHART 1 FOR SUGGESTED OVP TRIGGER VOLTAGES.
■CONNECT TEST CIRCUIT AS SHOWN IN FIGURE A. TEST VOLTAGE SOURCE MAY BE ANY POWER SUPPLY WITH A SHORT CIRCUIT LIMIT OF LESS THAN 8 AMPS (OVP-12) OR 20 AMPS (OVP-24).
■ENERGIZE AND ADJUST THE TEST VOLTAGE SOURCE TO THE DESIRED OVP VOLTAGE.
■ROTATE THE OVP ADJUSTMENT POT CCW (FROM ITS MAXIMUM CW POSITON) UNTIL THE OVP FIRES AS INDICATED BY A BY A 1 VOLT READING ON M1. LEAVE THE POT IN THIS POSITION, UNIT IS NOW READY FOR INSTALLATION INTO POWER SUPPLY.
■BOLT THE OVP ONTO THE POWER SUPPLY USING THE MOUNTING HOLES PROVIDE. CONNECT THE WHITE (+) LEAD TO THE POSITIVE OUTPUT AND THE BLACK (-) LEAD TO THE NEGATIVE OUTPUT.
OV-12 SERIES 、 OV-24 SERIES 、 OV-12 、 OV-24 |
|
|
|
|
|
User's Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
5/4/06 |
|
Rev. A 5/4/06 |
|
41-35625-0001 |
|
57 KB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.