Point of change
1. The LTB registration in EOL system will be ceased from the EOL notification in Dec/2019. The CO qty until the order deadline means LTB qty.
2. The products of Jun/2019 EOL notification will clear the remaining LTB qty if there is no CO registration at the end of Jun/2020.
Jun/2020 is order deadline in EOL notification.
3. For past EOL notifications (until 2018), the same process applies as for item 2, except for 6-inch legacy EOL products. (notice by Eisui)
Change of JSF input screen in Rainbow
a. After EOL notification, LTB CO can be issued the day after EOL notification.
b. After the CO deadline, JSF will be controlled along with CO lock.