BP2000 Conversion to Run the System at 120VAC - for Display Only

2025-03-19
This document provides instructions for converting the BP2000 system to operate at 120VAC. The process involves removing a jumper, placing two jumpers, adding a jumper wire, and making connections to the terminal block. It also includes precautions to avoid damage to the system if the steps are not reversed before applying 240V.

Balboa Water Group

BP2000

More

Part#

Power Conversion System

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

37 KB

- The full preview is over,the data is 1 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: