QAE40U LINE PROTECTIONS & EMC CONSIDERATIONS
●Below shows some blocks connected between power source and DC/DC module. Install the circuit of the block which is required.
● Each block has individual function and should be placed on the corresponding location.
● If CEMI is an Aluminum electrolytic capacitor and connected in parallel with CEMS, The capacitance we recommended for meeting EMS requirements could be CEMS pluses CEMI.
QAE40U 、 QAE40-36S□□U 、 QAE40-72S□□U 、 QAE40-36S05U 、 QAE40-36S12U 、 QAE40-36S15U 、 QAE40-36S24U 、 QAE40-36S28U 、 QAE40-36S48U 、 QAE40-36S53U 、 QAE40-72S05U 、 QAE40-72S12U 、 QAE40-72S15U 、 QAE40-72S24U 、 QAE40-72S28U 、 QAE40-72S48U 、 QAE40-72S53U |
|
|
|
User's Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
08/26/2020 |
|
|
|
|
|
2.8 MB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.