Near-Shore Wind Farm in the Netherlands uses Densit® Ducorit® S8 Grout during Installation Case Study
●The installation of the project began October 2nd, 2020 and was completed December 25th, 2020. With 89 concrete platforms grouted onto monopile transition pieces, the grouting work was extensive. Two tons of Ducorit S8 material per grouted connection were used in a single mixer spread, where the mixing and pumping equipment were mounted inside a convenient 20-foot container frame. Grouting operations were based on two 12 hour shifts to allow for a 24/7 operation.This makes Densit Ducorit S8 grout more than just a good alternative to OPC concrete, as the continuous pumping process allows multiple grouting operations to be completed in the same 24-hour period. Certified for installation in ambient conditions down to 1°C with outstanding flow retention, Ducorit S8 grout enabled three foundation installations within 24 hours.
●Ducorit S8 grout is DNV-GL-ST-C502 certified. It is a pneumatically transferred product, purpose designed for grouted connections in offshore wind turbine foundations. MPA Hannover provided third party certification validating our superior results. With the completed project comes the opportunity to supply the much needed clean energy demand. According to NS Energy, the Fryslan wind farm is expected to generate 1,184GWh of clean electricity a year, or approximately 340,000 Dutch households over the expected life span of 20 years.
Case Study |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
2021/4/6 |
|
|
|
|
|
713 KB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.