Chockfast® Grouting Compounds Increase Foundation Service Life at Cement Plant Case Study
●Problem
■At a cement manufacturer, the raw mill machine’s foundational plate faced vibration and cracks due to a lack of proper grouting. In addition to this, a significant gap existed between the concrete and the raw mill machine plate. The client was looking for a grouting solution that would prevent vibration, fill in the gap, and ensure a strong foundational surface.
●Solution
■Chockfast Red and Chockfast Orange grouts were installed due to their high compressive strength and strong bonding to concrete.
■To prepare for the Chockfast Red application, the previous foundational concrete was removed, and the surface was roughened to enhance adhesion. Chockfast Red was mixed using an in-house mortar mixer, poured into the foundation forms, and left to cure for 24 hours.
■The metal foundation plate was installed over the Chockfast Red grout and funnels placed throughout the plate in order to install Chockfast Orange underneath the equipment. Chockfast Orange epoxy grout was then poured into the metal forms of the foundation plate and left to cure for 24 hours.
[ raw mill machine ] |
|
Case Study |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
July 2022 |
|
|
|
|
|
338 KB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.