Eaton 93PS40 Hold-down Installation
●This application note details how to effect the hold – down installation of a 93PS40 UPS on a concrete floor to comply with seismic certificates 7790 and 7563 (refer appendices)
|
|
Application note & Design Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
2020/03/27 |
|
Version 5.2.2 |
|
AN0151 |
|
1.7 MB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.