056-PNS AOM Fiber Routing Instructions
● Remove silicone wraps from fibers and re-install one 3-4” from coupler to help contain the bundle.
● Cut splice sleeve for desired # of splice sleeves (optional)
● Install splice sleeve holder at a 45 deg angle 3/8” away from strain relief as shown
● Strip 12-14” of furcation tube/ sheathing off fiber that you will be splicing to.
● Splice the fibers
● Create a left loop above the AOM by routing the ribbon under the tab on the side wall and secure furcation tube to strain relief
● Re-install strain relief wall/plate
● Route the right side of the loop under the bottom row of couplers while lifting the 250
● Push ribbons up against the bottom of the couplers to consume slack
● Create another loop as in step #5
● Secure sleeves into position 2 & 3 to allow proper bend radius
● Route the second loop as in step #7 allowing fiber to relax in a loop below the AOM
|
|
User's Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
09.09.2020 |
|
v.1 |
|
|
|
426 KB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.