PXBCM Meter Color Touchscreen Display Quick Start Guide
■ Disconnect and lockout all power to the enclosure.
■ Inspect the enclosure door to determine the best mounting location for the PXBCM Meter Color Touchscreen Display.
▲ Note: A minimum clearance of 2.4 in. (61.0 mm) must be maintained between the ventilation holes in the back of the display and any other component within the enclosure.
■ Use the mounting template to mark the cutout area on the enclo-sure door. Cut out the marked area.
|
|
Datasheet |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
February 2015 |
|
|
|
TD150016EN / TBG001200 |
|
870 KB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.