Starting up a Nanotec Controller/Drive with OMRON NX1P2 Application Note
● To ensure correct operation with the OMRON PLC make sure that the interpolation time period in our controller is set to 2ms. This is needed because the minimum cycle time for the OMRON PLC is 2ms whereas our default value is 1ms.
|
|
Application note & Design Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
2020/8/11 |
|
Version 1.1.0 |
|
|
|
3.1 MB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.