LX3V-2ADV2DAV-BD User manual

2022-10-10
■Installation Instructions
●Before installation, it is necessary to ensure that the associated equipment of the PLC host and the terminal of the BD module are reliably powered off.
●This module comes with two standard terminals; please plug the terminals into the module terminals after wiring. Confirm the installation of host, module and wiring are correct and then power on.
●Caution:
▲When using the voltage output, ensure the external load resistance is no less than 2KΩ. If the external load resistance is less than 2KΩ, the output voltage willbe lower than the normal value;
▲The input must not exceed the absolute maximum (-15V/+15V) or cause the module to be damaged;
▲The fastening torque is 0.3-0.6N.m. Firmly screw down to prevent malfunctions;
▲The PLC main unit of the LX3V can only use one BD board. Don’t try to use two or more BD boards (these BD boards will not work);
▲This BD module only supports the following firmware versions or later. Users can check the PLC firmware version in D8001.
▼LX3VP:25103;
▼LX3VE: 25201;
▼LX3V-A2:25014;
▼LX3V-A1: 22006;
▲When mounting module to PLC, all the lights are blinking after power ON PLC, it means this PLC can’t support it, please purchase new PLC.
●Warnings:
▲Cut off the electricity before installation/disassembly of the unit or connection of wires onto the unit, to prevent electric shock or product damage.

WECON

LX3V-2ADV2DAV-BD

More

Part#

BD module

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

Jan 2018

V1.0.1

1.4 MB

- The full preview is over. If you want to read the whole 9 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: