PRODUCT: GREENSKIES SOLAR THERMAL SYSTEMS TECHNICAL BULLETIN

2022-10-08
■NEW ErP AGS10–2 & AGS10E–2 SOLAR PUMP STATION:
Expansion vessel pre-charge & system operating pressure
●With the introduction of the new ErP Solar pump stations listed above, please beaware that there are new guidelines concerning:
◆the expansion vessel pre-charge pressure (Fig. 1)
◆the solar thermal system operating pressure(Fig. 2)
●These guidelines can be found under sections 5.5.3& 6.2.5of the Installation and Servicing manual for the solar pump station.

Worcester Bosch

SOLAR THERMAL SYSTEMS

More

More

Application note & Design Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2015/12

TB 0102 a

266 KB

- The full preview is over,the data is 1 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: