VCM-3 VIBRO Condition Monitoring 3 Instruction

2022-09-08
● The purpose of the On-site commissioning procedure is to bring the VCM-3 in an operational state.
■ To check that the VCM-3 boots up correctly.
■ To verify that all channels which shall be used for monitoring the machine, are wired correctly and responds correctly to a tap test.
■ To finalize the commissioning procedures, configure the network and define the machine name.
● Before starting these procedures, it is assumed that the physical system installation has been checked. See C107758.002 EN Hardware Installation Instruction.
● The test described in the following sections is based on the factory test template which is initially loaded as part of the VCM-3 firmware. The factory monitoring (test) template is running by default in the VCM-3 when it is started up for the on-site commissioning procedure. When the on-site commissioning procedure has been completed the monitoring template, which will provide the VCM-3 with the correct personality for the particular machine type can be uploaded to the VCM-3 Homepage and activated on the device.

Bruel & Kjaer Vibro

VCM-3

More

Part#

Condition Monitoring Unit

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

03/2022

V03

C107759.002

1.1 MB

- The full preview is over. If you want to read the whole 22 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: