MAINSLINK-PRO Quick Start Guide

2022-07-29
■Operation:
▲This system provides two functions, Switching of the Pump from the boiler and Switching of the Boiler from the wiring Centre
▲When the wiring centre commands the Boiler ON, MAINSLINK-PRO B (Lin) is switched is Live, then MAINSLINK-PRO A Lout will automatically provide a LIVE signal to the boiler on.
▲When the Boiler outputs the Pump drive ON, MAINSLINK-PRO, (Lin) “A” is switched Live in, then MAINSLINK-PRO B Lout will automatically switch the pump on.
▲Connections at the Boiler:
▲The boiler output to the Pump is connected to the MAINSLINK-PRO A, (Live in).
▲The boiler control switching input is connected to the MAINSLINK-PRO A (Live out).
▲Connections at the Wiring Centre:
▲The thermostats switching output to switch the boiler is connected to the MAINSLINK-PRO B (Live in)The Pump is connected to the MAINSLINK-PRO B (Live out).

RF Solutions

MAINSLINK-PRO

More

Part#

bi-directional Radio Switch

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2022/3/24

QS-MAINSLINKPRO-4

859 KB

- The full preview is over,the data is 2 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: