Mains Interference Plagues Solar Parks Too

2022-07-15
■ GOSSEN METRAWATT’s monitoring system doesn't miss a single fault.
● The Tauberland Solar Park in Wertheim, Germany, went online in 2010. Equipment completed during the East and West construction phases generates a total of roughly 22 MWp (peak) and is currently supplying the equivalent of 9000 households with electrical power. With a planned power rating of 72 MWp after the final construction phase, the solar park is not only one of Europe’s largest photovoltaic systems, it’s also one of the most modern and effective of its type.

Gossen Metrawatt

solar park

More

More

Selection guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

1/12.12

3-337-310-03

1.9 MB

- The full preview is over. If you want to read the whole 6 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: