LSC-OS-SU-A Athena System On-site Startup Service Notes

2022-05-19
●Overview
■LSC-OS-SU-A-SA: On-site Athena startup by a Lutron Services Company representative for this system after Lutron equipment is installed. Equipment installation is verified, and the system is programmed and tested during this visit to comply with the approved sequence of operations. Unless noted on BOM, a separate pre-wire and training visit are not included with this system.
■LSC-OS-SU-A-PS: Athena startup by a Lutron Services Company representative for this system includes the following visits:
▲Remote pre-wire meeting with the electrical contractor, project manager, and owner's representative to discuss the project scope (including installation details on all equipment) and timeline.
▲Startup visit after Lutron equipment is installe.
▲Equipment installation is verified, and the system is programmed and tested during this time to comply with the approved sequence of operations.
■LSC-OS-SU-A-ST: Athena startup by a Lutron Services Company representative for this system includes the following visits:
▲Startup visit after Lutron equipment is installed.
▲Equipment installation is verified, and the system is programmed and tested during this time to comply with the approved sequence of operations.
▲Training Package: Includes both a 2-hour contractor training on the last day of commissioning and a customer system orientation visit to train the end user 30-90 days post occupancy and provide system optimization suggestions (LSC-CSO-VST).
▲Any person who will be operating in the system on a regular basis should be in attendance to the customer system orientation visit (LSC-CSO-VST).
■LSC-OS-SU-A-PST: Athena startup by a Lutron Services Company representative for this system includes the following visits:
▲Remote pre-wire meeting with the electrical contractor, project manager, and owner's representative to discuss the project scope (including installation details on all equipment) and timeline.
▲Startup visit after Lutron equipment is installed.
▲Equipment installation is verified, and the system is programmed and tested during this time to comply with the approved sequence of operations.
▲Training Package: Includes both a 2-hour contractor training on the last day of commissioning and a customer system orientation visit to train the end user 30-90 days post occupancy and provide system optimization suggestions (LSC-CSO-VST).
▲Any person who will be operating in the system on a regular basis should be in attendance to the customer system orientation visit (LSC-CSO-VST).

Lutron

LSC-OS-SU-ALSC-OS-SU-A-SALSC-OS-SU-A-PSLSC-OS-SU-A-STLSC-OS-SU-A-PST

More

Part#

Athena System

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

05.03.21

369118a

175 KB

- The full preview is over. If you want to read the whole 9 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: