Test Procedure for the NCD57253GEVB Evaluation Board

2022-05-12
●This document is used to test the NCD57253GEVB before its first use, it is used to ensure the functionality of each evaluation board
●Test 1: Continuity test
■Power up Voltage sources
■Measure input currents – value must be lower than 10mA per channel
●Test 2: Functionality / Setup Test
■Power up Voltage sources
■Power up Signal Generators
■Check input Current - value must be lower than 10mA per channel
■Check A and B Currents - value must be lower than 50mA per channel
■Check input signals – signals need to be in opposite phase without deadtime
■Check output signals – output signal must be in phase with input signal with 100ns delay maximum

ON Semiconductor

NCD57253GEVB

More

Part#

Evaluation Board

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

1/31/2022

628 KB

- The full preview is over. If you want to read the whole 3 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: