SLB2300 SLW2300 2300W PIR Light Controller Installation & Operating Instructions

2022-03-29
●General Information
■These instructions should be read carefully and retained for further reference and maintenance.
●Safety
■Before installation or maintenance, ensure the mains supply to the PIR sensor is switched off and the circuit supply fuses are removed or the circuit breaker turned off.
■It is recommended that a qualified electrician is consulted or used for the installation of this PIR sensor and install in accordance with the current IEE wiring and Building Regulations.
■Check that the total load on the circuit including when this PIR sensor is fitted does not exceed the rating of the circuit cable, fuse or circuit breaker.

Timeguard

SLB2300SLW2300

More

Part#

PIR Light Controller

More

More

User's Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

November 2017

Issue 3

67-058-531

814 KB

- The full preview is over. If you want to read the whole 12 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: