HL 1610 S,HL 1810 S,HL 1910 E,HL 2010 E,HG 2310 LCD,HG 2510 ESD INSTRUCTIONS
■HL 1810 S:The tool is switched ON and OFF at the three-stage switch on the back of the grip handle. Airflow and temperature can be adjusted to 3 settings. Stage 1 is a Cool air stage at 120 °F with an airflow rate of 3.6 cf/min. Stage 2 reaches 750 °F at an airflow of 10.0 cf/min., stage 3 delivers 1100 °F at 15.9 cf/min. The outlet protection tube can be removed in order to install the overhead security hanger.
■HL 1910 E:The tool is switched ON and OFF at the three-stage switch on the back of the grip handle. In addition to three-stage speed/airflow control (stage 1 is a ”Cool-air stage” at 120 °F ), temperature can be continuously adjusted over a range of 120 °–1100 °F at the thumbwheel. The numbers (1 to 9) on the thumbwheel serve as a guide only. Whereas ”1” means 120 °F, the maximum temperature of 1100 °F is attained at ”9”. Airflow can be adjusted to the three stages of 3.6/10.6/17.6 cf/min. The outlet protection tube can be removed in order to install the overhead security hanger.
■HL 2010 E:
●The tool is switched ON and OFF at the three-stage switch on the back of the grip handle. In addition to three-stage speed/airflow control, temperature can be continuously adjusted over a range of 120 °–1150 °F by the pushbuttons. The target temperature can be increased in 10 °F steps by pressing the ”+”side of the temperature pushbutton or reduced by pressing the”–”side of the temperature pushbutton. Pressing the button briefly increases or reduces the target temperature by one 10 °F step. Keeping the button pressed will continue to increase or reduce the temperature in steps of 10 °F until the button is released or the minimum or maximum temperature is set.
●Blower stage 1delivers a temperature of 120 °F. The tool will take a short while
to cool to 120 °F after switching down to blower stage 1 when it has been operating at high temperatures on blower stage 2 or 3. While the tool is cooling down, the LCD display shows the actual temperature at the nozzle outlet. After switching OFF,the tool stays in the last setting. The outlet protection tube can be removed in order to install the overhead security hanger.
■HG 2310 LCD / HG 2510 ESD:The tool is switched ON and OFFat the multi-stage switch on the back of the grip handle. The distance from the object you are working on depends on material and intended method of working.Always try out the air flow and temperature on a test piece first.Using the attachable accessory nozzles the flow of heat can be controlled with maximum precision. Take care when changing hot nozzles!When using the heat gun in the self-resting position, make sure it is standing on a stable, non-slip and clean surface. The outlet protection tube can be removed in order to install the overhead security hanger.
HL 1610 S 、 HL 1810 S 、 HL 1910 E 、 HL 2010 E 、 HG 2310 LCD 、 HG 2510 ESD |
|
[ Pipes ][ fittings ][ sheets ][ building pro-files ][ technical moulding ][ Floor coverings ][ wallpapers ][ hoses ][ toys ][ Domestic articles ][ electrotechnical articles ][ Baths ][ baskets ][ canisters ][ insulat-ing material ][ HT drainage pipes ][ mouldedseats ][ packaging ][ car component ][ equipmenthousings ][ cases ] |
|
User's Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
2005/10/7 |
|
|
|
|
|
3.9 MB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.