8MW BESS COUPLED TO HYDRO FOR PRIMARY CONTROL POWER

2022-03-11
●THE CHALLENGE:
■In 2020 Nidec was chosen by Verbund, Austria’s leading electricity company and one of the largest producers of hydropower electricity in Europe, as supplier for Austria’s biggest power plant battery in operation, Blue Battery.THE SPECIFIC GOAL IS THAT THE BESS CAN EITHER PROVIDE:8MW Primary control power in stand-alone or 16 MW in combination with the hydro power plant. In this case the battery operated in double power output in the range of +/- 100 mHz deviation compared to a 8MW stand-alone BESS and only in the rare cases where the +/-100mHz are exceeded the HPP provides the additional required power.

NIDEC ASI

More

More

Case Study

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2022/03/05

2022/2/8

2 MB

- The full preview is over,the data is 2 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: