Protecting seismic survey cables

2022-03-10
■ Seismic towed arrays undergo significant loading during operation. The towing forces from the vessel combine with drag from the sea and lateral loads from diverter and cross chains. The secomplex loads need to be correctly controlled to ensure that the seismic array operates correctly.
■ Using our expertise in understanding the difficulties associated with working in demanding conditions, our towing attachments and ancillaries help protect the seismic survey cables from over bending and to increase the local stiffness of cables at the attachment point.

Trelleborg

Protecting seismic survey cablesLead-in Bend AssemblyConnector Mounted AssembliesUmbilical Tow Point ProtectorHelical RodMultiple Ballast Weight Assembly

More

More

Datasheet

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2019/10/16

925 KB

- The full preview is over,the data is 2 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: