TPC 115-10D/LT ASSY. 2 ENGINEERING DIAGRAM

2022-03-07
●RACKMOUNTED STEEL CHASSIS ZINC PLATED 19.00" WIDE STD. RACK MOUNTING
▲1.72" HIGH
▲8.00" DEEP
▲UNIT REQUIRED SUPPORT BRACKETS
●INPUT: 125 VA.C., SINGLE PHASE, 50/60 HZ. 24A MAXIMUM TOTAL CURRENT.
▲POWER CABLE: 15 FT; 10/3 SOOW CABLE
▲POWER PLUG: NEMAL5-30P
●OUTPUT: 120VAC16AAT10NEMA5-20R RECEPTACLES,
▲2 UNSWITCHED, ALWAYS ON
▲8 SWITCHED, ACTIVATED BY "REMOTE/OFF/LOCAL” SWITCH.
▲TIME DELAY OF 4 SEC., BETWEEN POWER UP OF "SWITCHED 1" AND "SWITCHED 2" RECEPTACLES ONLY SEQUENCED REMOTE ACTIVATES 4 SECONDS AFTER SW #2
●CIRCUIT BREAKER: MAGNETIC, 2 POLE, 15 AMP
▲HIGH-INRUSH TIME DELAY CURVE.
●INDICATOR LIGHTS: 3 GREEN
▲ONE; ON WHEN CIRCUIT BREAKER IS ON
▲TWO; ONE FOR EACH SWITCHED SECTION
●FILTER: EMI/RFI, 30 AMP RATING, 50/60 HZ.
▲COMMON MODE, LINE TO GROUND
▲DIFFERENTIAL MODE, LINE TO LINE
●SPIKE SURGE SUPPRESSION
▲COMMON MODE, LINE TO GROUND
▲DIFFERENTIAL MODE, LINE TO LINE
●REMOTE I/O SWITCHING CONNECTOR (5)
▲WITH AMP 60619-1 SOCKET CONTACTS.

Eaton

TPC 115-10D/LT

More

Part#

RACK PDU

More

More

Outline Dimension Drawing

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

31 AUG 05

REV B

TPC_115_10D_LT_2062B_ME

221 KB

- The full preview is over,the data is 1 pages -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: