Top Ten SCPI Programming Tips for Signal Generators
●This application note briefly summarizes basic tips and information about SCPI1 programming for remote-controlling Rohde & Schwarz signal generators.
●The following section lists ten useful SCPI programming tips. These tips and additional helpful hints are described in detail in the remaining sections of this application note.
R&S®SMW200A 、 R&S®SMU200A 、 R&S®SMBV100A 、 R&S®SMJ200A 、 R&S®AMU200A 、 R&S®SMA100A 、 R&S®SMB100A 、 R&S®SMC100A 、 R&S®SMF100A 、 R&S®AFQ100A 、 R&S®AFQ100B |
|
|
|
Application note & Design Guide |
|
|
|
Please see the document for details |
|
|
|
|
|
|
|
English Chinese Chinese and English Japanese |
|
2013/2/7 |
|
|
|
|
|
827 KB |
- +1 Like
- Add to Favorites
Recommend
All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.