DP2 CABLE LAYING VESSEL Data sheet

2021-12-09
●DESCRIPTION
■Giulio Verne is a DP2 cable laying vesselbuilt for most challenging worldwide subsea operations. With its 7,000 tonscarousel capacity, the vessel is equipped to conduct deepest power cable lay up to 1,600m water depth.
■The primary function of the vessel is the execution of challenging power cable installation projects. However it can also be used on any kind of subsea and offshore project –from shallow to deep water -for which she is ideally suited and equipped.
■She holds an extensive track record, on a variety of diverse subsea construction projects and she is well known in the market as a reliable and robust unit, capable of handling harsh environmental conditions.
●VESSELS KEY FEATURES
■Classification: RINA DYNAPOS AM/AT R
■DP2 cable lay vessel
■7,000 tons carousel
■Bundled cable lay capability
■Simultaneous laying and burial capabilities
■Conducted world’s deepest power cable lay at 1600m water depth
■Accommodation for 90 persons
■2 x Aft Schottel Lips Azimuth Fixed Pitch Thrusters with Propellers in Nozzles
■2 x Forward Retractable Schottel Lips Azimuth Fixed Pitch Thrusters with Propellers in Nozzles
■1 x Tunnel Thruster

Prysmain

CABLE LAYING VESSEL

More

More

Datasheet

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

2017/11/20

413 KB

- The full preview is over. If you want to read the whole 3 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: