Manufacturing Site Alternate - Assembly Back End Tape and Reel at Ardentec(PCN210201)

2021-02-05
Description of Change:
EPC announces the qualification of ARDENTEC HUKOU for WLCSP tape and reel assembly. ARDENTEC HUKOU is approved as a back end tape and reel assembly site for the released to sales part number s identified in Appendix I. There will be no change in manufacturing technology or to the package dimensions. This change does not affect the form, fit, function of the product as defined in the datasheet.
Successful qualification testing of the ARDENTEC HUKOU facility was performed to ensure product quality and reliability requirements are met or exceeded. A
RDENTEC HUKOU will begin production of EPC products in Appendix I on or after January 31, 2021. Products with date code 2106 and afterward could be produced by ARDENTEC HUKOU. During the transition period customers may receive shipments from any approved EPC assembly site. Shipment of such products to a customer will only occur after the customer PCN is signed off.

EPC

EPC2202EPC2206EPC2212EPC2214

More

Part#

More

More

PCN/EOL

More

More

Please see the document for details

More

More

WLCSP

English Chinese Chinese and English Japanese

February 2, 2021

PCN210201

216 KB

- The full preview is over. If you want to read the whole 3 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: