KX021 KX022 KX023 Power-On Procedure

2022-04-20

●Introduction
■This technical note is intended to provide information about the proper power-on procedure of the Kionix KX021, KX022, and KX023 accelerometers.
■Proper functioning of power -on reset (POR) is dependent on the specific VDD, VDD-Low, T-VDD (rise time), and T-VDD _OFF profile of individual applications. It is recommended to minimize VDD-Low, and T-VDD, and maximize T-VDD_ OFF. It is also advised that the VDD ramp up time T-VDD be monotonic. To assure proper POR, the application should be evaluated over the customer specified range of VDD, VDD-Low. T-VDD, T-VDD_OFF and temperature as POR performance can vary depending on these parameters

Kionix

KX021KX022KX023

More

Part#

accelerometers

More

More

Application note & Design Guide

More

More

Please see the document for details

More

More

English Chinese Chinese and English Japanese

12 July 2019

TN014

447 KB

- The full preview is over. If you want to read the whole 7 page document,please Sign in/Register -
  • +1 Like
  • Add to Favorites

Recommend

All reproduced articles on this site are for the purpose of conveying more information and clearly indicate the source. If media or individuals who do not want to be reproduced can contact us, which will be deleted.

Contact Us

Email: