
© 2015 Glenair, Inc • 1211 Air Way, Glendale, CA 91201 • 818-247-6000 • www.glenair.com • U.S. CAGE code 06324 • BacNav OFS
Dimensions in Inches (millimeters) are subject to change without notice.
SERIES 390
BacNav™ OFS
Assembly Instructions
3/8" ±1/8" (Electrical)
1/2" ±1/8" (Fiber-optic)
Calculate Length
For Contact
Termination
To Rear Of
Connector Shell
Connector-coupling-nut
Engagement Length
Main Body Assembly
Overall Length
Eective Main Body
Assembly Length
Connector
Length
The Following suggested assembly procedure serves as a guide for proper assembly and installation of Glenair P/N 390G084
Compression-nut and
Gland-nut Assembly
Main Body
Assembly
Loosen with 7/64” Hex-Wrench
to Reposition Angle
O-ring
(If Applicable)
Insert-retainer
(If Applicable)
Braid/Kevlar® Folded
Back Flat Over Cable
Tape
Contacts/OFC's
Step 1
Cut cable to desired length, making sure to include contact
termination length and desired service loop length (Note:
service loop not applicable for ber termination.)
Step 2
Slide BacNav OFS backshell assembly onto cable-end being
terminated. Slide insert-retainer and o-ring or adapter (as
applicable) onto cable following the backshell. (Note: Adapter
may be coupled to backshell.) Unscrew and separate intermediate
compression nut and gland assembly from main body assembly.
(See gure 1)
Step 3
Prepare cable end for termination.
a. Determine cable jacket strip length. For precise
determination, it is recommended to terminate a connector
using a minimum strip length, then mark the cable jacket
at the required distance behind the main body assembly.
Length will include contact termination length, desired
service loop length (not applicable for ber) and eective
main body assembly length (includes installed adapter
length if present). (See gure 2)
b. Remove outer cable jacket exposing cable-shield (braid) or
Kevlar® strength members (ber-optic applications).
c.
Shielded electrical cable applications: Remove any water-
block material from cable-shield. Trim cable shield to 3-4
inch length (optional) then fold back at over outer cable
jacket and tape down.
Fiber-optic applications: Leave Kevlar® strength members
long, fold back over outer cable jacket and tape down
(See gure 3)
Assembly Overview
Fig. 1
Fig. 2
Fig. 3

© 2015 Glenair, Inc • 1211 Air Way, Glendale, CA 91201 • 818-247-6000 • www.glenair.com • U.S. CAGE code 06324 • BacNav OFS
Dimensions in Inches (millimeters) are subject to change without notice.
SERIES 390
BacNav™ OFS
Assembly Instructions
Step 4
Prepare conductor/bers and terminate contacts/OFCs according
to specic connector requirements.
Step 5
Insert contacts/OFCs into connector according to specic connector
requirements.
Step 6
Move backshell main body assembly (with adapter if present,
or insert-retainer/o-ring if present) towards cable end to mate
with connector. Position insert-retainer and o-ring if applicable,
then thread backshell/adapter-to-connector coupling nut onto
connector ensuring proper alignment/orientation with respect
to connector master-key, and verifying proper engagement of
clocking teeth or splines as the coupling nut is hand tightened.
(See Figure 4)
Step 7
Verify cable jacket strip length, and terminate cable-shield/
Kevlar® strength members. (Refer to banding tool instructions for
additional details).
Shielded electrical cable applications: End of cable jacket should
measure " ± " from conical end of main backshell body assembly
to cable jacket (with service loop length contained inside backshell).
(See gure 2) Un-tape cable-shield and fold forward over conical
end and banding platform, ensuring even 360° distribution.
Prepare termination-band and installation tool, positioning
over shield in the center of the banding platform. (See gure 5)
Complete band termination, ensuring cable jacket end remains
” ± from conical end of main backshell body. (See gure 6)
Fig. 4
Fig. 6
Fig. 5