DEFENSE
LOGISTICS
AGENCY
DEFENSE SUPPLY CENTER, COLUMBUS
POST
OFFICE BOX 3990
COLUMBUS,OH
43218-3990
IN
REPLY
008
REFER TO
DSCC-VQ (VQE-08-015013/Mr. DelloStrilto/614-692-0616/cd)
SUBJECT:
Manufacturer's
Certification,
MIL-PRF-19500N,
FSC
5961
Ms. Ercilia Sanchez
Serntech Corpus Christi
SA
de
CY
Carretera A Matamoros Y Brecha
E-99 Edificio 8. Parque Industrial Reynosa
CO,
Reynosa. Tamps, Mexico
CP 88500
Dear Ms. Sanchez:
Your facility at Carretera A Matamoros Y Brecha, E-99 Edificio
8,
Parque Industrial Reynosa, CD,
Reynosa, Tamps, Mexico was audited by Mr. Thomas Hood,
Mr.
Carl DelloSlrilto, and Mr. Alan Barone
of
this Center, Mr. Melvin Cohen and Mr. George Cuevas
of
the Aerospace Corp., Mr. Benny Damron of
NASA, and Mr. Roger Fresh of Raytheon on June 11-13, 2007 for compliance with the Manufacturer's
Certification req uiremen
ts
of
Appendix 0
of
MIL-PRF-19500
N.
Compliance with these requirements has been successfully demonstrated; therefore Semtech
Corpus Christi
SA
de C.V.
is
considered a certified manufacturer eligible to qualify and supply JAN,
JANTX, and JANTXV silicon power rectifiers and bridge rectifier assemblies, and transient voltage
suppressor diodes (TVS)
in
axial leaded. glass bodied and surface mount packages
in
accordance with
the requirements
of
MIL-PRF-19500N,
All wafer fabrication and assembly is
to
be performed at your Reynosa facility. Semtech Reynosa
is
considered the basic plant and
is
responsible for device critical interfaces, performance, quality and
reliability, Note: Semtech may continue
to
use the die bank from Corpus Christi for TVS die until depleted.
All qualification tests, conformance inspections, and screening must be performed at facilities that
have DSCC-VQE Laboratory Suitability Status for each of the applicable test methods.
Semtech Reynosa
is
currently
on
a two-year audit frequency. This certification can only be
terminated by written notification from this Center. For the duration of the certification, the manufacturer
is
subject to periodic reviews by the qualifying activity
Or
its representatives. Certification will not normally be
extended beyond the two-year period without a reaudi\.
Note: The results
of
the
osee
audit held on June 11-13, 2007 were found by examining a
sampling
of
the manufacturer's normal manufacturing, testing, and processing procedures. The
acceptance
of
the corrective actions from the above referenced audit does not relieve the manufacturer
of
its contractual obligation to deliver product that complies with all specification requirements.
Sincerely,
Federal
Recycling
Program
-.
~
P"nled
on
Recycled
Paper
.
p.
.,.