PROTONODE-RER-1.5K /
PROTONODE-RER-10K
Multi-Protocol Device Server Initial Setup Guide
The nVent RAYCHEM ProtoNode-RER multi-protocol gateway
is used to connect nVent RAYCHEM C910-485, TraceTek SIM,
and ACS-30 Controllers to Building Management Systems (BMS)
using BACnet or Metasys N2 protocol.
The ProtoNode-RER is preprogrammed with the RAYCHEM
Modbus registries for simple integration into your BMS. The nVent
RAYCHEM ProtoNode-RER-1.5K is configured to communicate
with up to 6 C910-485 controllers or an nVent RAYCHEM ACS-30
system up to 25 circuits. The nVent RAYCHEM ProtoNode-RER-
10K is configured to communicate with an ACS-30 system up to
170 circuits.
For technical support call nVent Thermal Management at
(800) 545-6258.
TOOLS REQUIRED
Small flat-blade screwdriver
ADDITIONAL MATERIALS REQUIRED
Wall fasteners for surface mounting (four fasteners)
RS-485 cable (Belden # 8761, or Carol # C2514)
9–30 Vac/Vdc power source recommended
(5 Vdc also compatible)
Appropriate RAYCHEM controller Installation Instructions
For detailed configuration information, including a complete start-up
guide and mapping documents, please contact your local sales rep or
nVent Technical Support. Global support contact information is listed
at the end of this document.
APPROVALS
BACnet Testing Labs (BTL) B-ASC
ADDITIONAL INFORMATION
The ProtoNode-RER gateways are highly flexible and
accommodate the most commonly used protocol. They come
pre-programmed with the Modbus mapping of the C910 and
ACS-30 controllers.
The initial set up of these controllers is outlined on:
Page 2 for the ProtoNode-RER (BACnet and Metasys N2)
The set-up involves 4 steps:
1. Configure the DIP switches for address, baud rate, protocol
and RAYCHEM controller (Figure A)
2. Connect RS-485 to RAYCHEM controller (Figure B)
3. Connect power supply to ProtoNode (Figure B)
4. Connect to the Field or BMS system after the completing
steps 1-3 (Figure C)
Once the gateway is connected and configured the RAYCHEM
Modbus registries will be visible to the system integrator through
the field BMS.
Communication set-up requirements for C910 and
ACS-30 controllers:
Protocol: Modbus-RTU (default for ACS-30)
Baud rate: Auto or 9600
Parity: None
Modbus Address: 1
2 | nVent.com
ProtoNode-RER
Front
Bottom
Top
ProtoNode-RER Layout, Terminals and Switch Positions
FIRE AND SHOCK HAZARD: Do not mount the
ProtoNode-RER in a hazardous location. Follow all local
electrical safety procedures. Disconnect power before
servicing or opening this unit. For technical support, call
nVent Thermal Management at (800) 545-6258.
The ProtoNode-RER is an electronic unit. During
installation, take the following precautions to avoid
damage to its electronic components:
Handle with care to avoid mechanical damage.
Keep electronics dry.
Avoid exposure to static electricity.
Avoid contamination with metal filings, liquids, or
other foreign matter.
WARNING:
IMPORTANT: