CPI Canada Inc.
Installation
2
Use and disclosure is subject to the restrictions on page II of this CPI document.
CMP 200
/ CMP 200
DR X-ray Generator Service Manual
MAN901471
Rev. AD
Page 2-1
Chapter 2 Installation
Contents
Introduction ----------------------------------------------------------------------------------------- 2-3
Unpacking -------------------------------------------------------------------------------------------- 2-3
Removing the Generator Cover ---------------------------------------------------------------- 2-4
Major Component Layout ----------------------------------------------------------------------- 2-4
Equipment Placement ---------------------------------------------------------------------------- 2-4
Main Cabinet ------------------------------------------------------------------------------------------------- 2-4
Control Console ---------------------------------------------------------------------------------------------- 2-4
Anchoring the Generator to the Floor ---------------------------------------------------------------- 2-6
Wiring to the Generator ------------------------------------------------------------------------- 2-6
Control Console ---------------------------------------------------------------------------------------------- 2-7
Hand Switch (Optional)------------------------------------------------------------------------------------ 2-13
X-ray Tube Stator Cable ----------------------------------------------------------------------------------- 2-13
Checking the Connection of the X-ray Tube Stator Cable --------------------------------------- 2-16
Power Line Mains ------------------------------------------------------------------------------------------- 2-16
High Voltage Cables ---------------------------------------------------------------------------------------- 2-22
X-Ray Tube Housing Ground ----------------------------------------------------------------------------- 2-24
Room Equipment -------------------------------------------------------------------------------------------- 2-24
Emergency Power Off / Power Distribution Relay ------------------------------------------------ 2-24
Safety Interlocks --------------------------------------------------------------------------------------------- 2-25
Jumper Settings on the HV Auxiliary Board------------------------------------------------- 2-25
Programming the Dual-Speed Starter -------------------------------------------------------- 2-27
EPROM type / dual-speed starter - applies only to DSS Board #728877-06 --------------- 2-28
Tube type setting on DIP-Switch SW1 for DSS Boards #728877-06 and #903132-02 --- 2-29
Programming DIP-switch SW3 for DSS Board #903132-02 -------------------------------------- 2-31
Inspecting DIP-Switch SW8 setting for DSS Board #903132-02 -------------------------------- 2-33
Configuring dual-speed starter 901297-15 / 901298-15 ----------------------------------------- 2-34
Generator Control Board DIP-Switch Settings --------------------------------------------- 2-35
Initial Run-up ---------------------------------------------------------------------------------------- 2-35
Auxiliary Transformer Line Voltage Tap Selection ------------------------------------------------ 2-36
Initial Voltage Measurements --------------------------------------------------------------------------- 2-38
Tube mA Auto Calibration ----------------------------------------------------------------------- 2-39
CPI Canada Inc.
Installation
2
Use and disclosure is subject to the restrictions on page II of this CPI document.
CMP 200
/ CMP 200
DR X-ray Generator Service Manual
MAN901471
Rev. AD
Page 2-2
Powering-up Touchscreen ------------------------------------------------------------------------------ 2-39
Final Checks ------------------------------------------------------------------------------------------------ 2-40