CPI Canada Inc.
Installation 2
Use and disclosure is subject to the restrictions on page II of this CPI document.
CMP 200
/ CMP 200
DR X-ray Generator Service Manual
MAN901471
Rev.AJ
Page 2-1
Chapter 2 Installation
Contents
Introduction ----------------------------------------------------------------------------------------- 2-3
Unpacking -------------------------------------------------------------------------------------------- 2-3
Removing the Generator Cover ---------------------------------------------------------------- 2-4
Major Component Layout ----------------------------------------------------------------------- 2-4
Equipment Placement ---------------------------------------------------------------------------- 2-4
Main Cabinet ------------------------------------------------------------------------------------------------- 2-4
Control Console ---------------------------------------------------------------------------------------------- 2-5
Anchoring the Generator to the Floor ---------------------------------------------------------------- 2-6
Wiring to the Generator ------------------------------------------------------------------------- 2-6
Control Console ---------------------------------------------------------------------------------------------- 2-7
Hand Switch (Optional)------------------------------------------------------------------------------------ 2-14
X-ray Tube Stator Cable ----------------------------------------------------------------------------------- 2-15
Checking the Connection of the X-ray Tube Stator Cable --------------------------------------- 2-18
Power Line Mains ------------------------------------------------------------------------------------------- 2-18
High Voltage Cables ---------------------------------------------------------------------------------------- 2-24
X-Ray Tube Housing Ground ----------------------------------------------------------------------------- 2-26
Room Equipment -------------------------------------------------------------------------------------------- 2-26
Emergency Power Off / Power Distribution Relay ------------------------------------------------ 2-26
Safety Interlocks --------------------------------------------------------------------------------------------- 2-27
Jumper Settings on the HV Auxiliary Board------------------------------------------------- 2-27
Programming the Dual-Speed Starter -------------------------------------------------------- 2-29
Setting Tube Type ------------------------------------------------------------------------------------------- 2-31
Setting Line Input Voltage -------------------------------------------------------------------------------- 2-34
Verifying Phase-Shift Capacitor Configuration: ---------------------------------------------------- 2-34
Inspecting DIP-Switch SW8 Setting -------------------------------------------------------------------- 2-35
Verifying the X-ray Anode Speed ----------------------------------------------------------------------- 2-36
Generator Control Board DIP-Switch Settings --------------------------------------------- 2-37
Initial Run-up ---------------------------------------------------------------------------------------- 2-38
Auxiliary Transformer Line Voltage Tap Selection ------------------------------------------------ 2-38
Initial Voltage Measurements --------------------------------------------------------------------------- 2-40
Tube mA Auto Calibration ----------------------------------------------------------------------- 2-41
CPI Canada Inc.
Installation 2
Use and disclosure is subject to the restrictions on page II of this CPI document.
CMP 200
/ CMP 200
DR X-ray Generator Service Manual
MAN901471
Rev.AJ
Page 2-2
Powering-up Touchscreen ------------------------------------------------------------------------------ 2-41
Final Checks ------------------------------------------------------------------------------------------------ 2-42