Field testing
Procedure
LANmark-6A
Technical Paper
Nexans Cabling Solutions
November 2008 - Revision 1.1
Table of Contents
1 Introduction 3
2 How to proceed? 4
2.1 Introduction 4
2.2 Permanent link testing vs. Channel testing 4
2.3 Category 6A and connecting hardware 4
2.4 Installation models 5
2.4.1 2 connectors : Interconnect - TO 5
2.4.2 3 connectors : Cross connect - TO 5
2.4.3 3 connectors : Interconnect - CP - TO 6
2.4.4 4 connectors : Cross connect - CP - TO 7
2.4.5 Summary 7
3 What equipment is available to test for compliance? 8
3.1 Level IV tester 8
3.2 Care of the Tester and leads 8
3.3 Tester Adapters and limits to be used 9
3.4 Selecting the correct cable type 10
3.5 Before you go to site 10
4 Understanding the test results 11
4.1 What the test results show 11
4.2 What to do with the result – Warranty Certification 11
Field Testing Procedure LANmark-6A 2 November 2008